logo

MISR Field Validation Page

This page provides links to several areas of information that will be of interest to the Calibration/Validation Team as well as other personnel associated with MISR and EOS calibration and science data validation. (development)


What's New

AirMISR 12/5/98 products


SPIE paper:

CIMEL data (last updated 3/5/98) Validation Schedule (last updated 2/25/98) AirMISR images taken during Engineering Flight #3 (August 25, 1997 over Moffett Field, CA)

Images have been flipped and rotated into geographic orientation. Corrupt lines of data have been set to zero. Color tables have been stretched to enhance detail.

IFRCC Documents:
SDFM Abstracts (March 31, 1997)

Upcoming Meetings (March 25, 1997)

MISR Calibration/Validation References (March 20, 1997)



Schedules

Documentation


M Or: Return to main MISR home page

Send mail to Bill Ledeboer
Last updated: April 1, 1997 (no joke!)